Galvanized Concrete Steel Nails

Galvanized Concrete Steel Nails
Heavy hardened steel concrete nails for masonry and brickwork
- Material
- Hardened carbon steel
- Shank Diameter
- 3.0-6.0mm
- Length Range
- 1" to 6" (25-150mm)
- Finish
- Galvanized
Product Description
Galvanized concrete steel nails are through-hardened masonry nails for driving into mortar joints, brick and soft concrete with a normal hammer. The thick shank resists bending and the chisel point bites masonry without spalling the surface face. Used for cable clips, straps, lath and general building fixings.
Full Specifications
| Material | Hardened carbon steel |
|---|---|
| Shank Diameter | 3.0-6.0mm |
| Length Range | 1" to 6" (25-150mm) |
| Finish | Galvanized |
| Point | Chisel / diamond point |
| Standard Packaging | Export cartons, pallets or coils suited to product type |
| Custom Options | OEM sizes, private-label packaging on request |
| Compliance | Manufactured under ISO 9001 quality system |
Key Features
Factory Direct Quality
Every batch is checked for shank diameter, head integrity and point sharpness before packing.
Consistent Collation
Tight manufacturing tolerances keep nailers and staplers feeding without jams.
Full Finish Range
Bright, electro-galvanized and hot-dipped galvanized options for any exposure.
Flexible Packaging
Bulk, boxed, or custom retail packaging with your private label.
Applications
Construction
Pallet & Crating
Carpentry
Export Packing
Frequently Asked Questions
What is the minimum order quantity?
Our MOQ is 1,000 kg (1 metric ton) for standard items; trial orders of 500 kg can be arranged for first-time customers.
Can you supply custom sizes and packaging?
Yes. We produce non-standard lengths, diameters and collations, and pack to your artwork including private-label boxes and bags.
What finishes are available?
Bright (uncoated), electro-galvanized, hot-dipped galvanized and stainless steel, selected to suit indoor, outdoor or marine service.
What is the lead time?
Stock items ship in 7-15 days. Custom production typically takes 20-30 days depending on quantity and specifications.


