Hot Dipped Galvanized Welded Wire Mesh

Hot Dipped Galvanized Welded Wire Mesh
Hot-dip galvanized welded mesh for long-term outdoor service
- Zinc Coating
- Hot-dipped, 70-300 g/m2
- Wire Diameter
- 1.8-6.0mm
- Mesh Opening
- 1/2" to 6" (13-150mm)
- Form
- Panels and rolls
Product Description
Hot-dipped galvanized welded wire mesh passes completed weldmesh through molten zinc, coating wires and welds with a thick, metallurgically bonded layer that protects for decades in outdoor, marine and livestock environments. The specification for permanent fencing, feedlot panels and bridge mesh where recoating is impossible. Standard and heavy zinc classes.
Full Specifications
| Zinc Coating | Hot-dipped, 70-300 g/m2 |
|---|---|
| Wire Diameter | 1.8-6.0mm |
| Mesh Opening | 1/2" to 6" (13-150mm) |
| Form | Panels and rolls |
| Life | 20+ years rural exposure |
| Standard Packaging | Export cartons, pallets or coils suited to product type |
| Custom Options | OEM sizes, private-label packaging on request |
| Compliance | Manufactured under ISO 9001 quality system |
Key Features
Weld Integrity
Every intersection is resistance-welded for strength that will not unravel when cut.
Coating Systems
Electro-galvanized, hot-dipped galvanized and PVC coatings for lasting corrosion protection.
Custom Cutting
Panels, slit widths and cut pieces produced to your drawings.
Container-Ready Packing
Rolls and panels are blocked and braced for safe ocean freight.
Applications
Fencing & Cages
Construction
Industrial Guards
Agriculture
Frequently Asked Questions
What is the minimum order quantity?
MOQ is typically 50 rolls for stocked specifications; mixed containers with other products are welcome.
Can you produce custom mesh openings?
Yes. We weave and weld to custom openings, gauges, widths and panel sizes against your drawing.
How is the mesh packed for export?
Rolls are wrapped in waterproof paper and woven bags; panels are stacked on pallets with edge protection.
What is the lead time?
Stock items ship in 7-15 days; custom mesh production takes 20-30 days.


