PVC Coated Rebar Tie Wire

PVC Coated Rebar Tie Wire
Coated tie wire that protects epoxy-coated rebar from damage
- Core
- Annealed soft steel wire
- Coating
- PVC / PE jacket, 0.3-0.6mm
- Wire Gauge
- 16-18 gauge
- Colors
- Black, green, gray
Product Description
PVC coated rebar tie wire is specified wherever epoxy-coated or galvanized rebar must not be scratched: the soft jacket prevents coating breach at tie points, preserving corrosion protection in bridge, marine and treatment plant construction. The wire beneath remains fully annealed for easy twisting. Color matched or contrasting to aid inspection.
Full Specifications
| Core | Annealed soft steel wire |
|---|---|
| Coating | PVC / PE jacket, 0.3-0.6mm |
| Wire Gauge | 16-18 gauge |
| Colors | Black, green, gray |
| Coil | 3.5kg or custom coils |
| Standard Packaging | Export cartons, pallets or coils suited to product type |
| Custom Options | OEM sizes, private-label packaging on request |
| Compliance | Manufactured under ISO 9001 quality system |
Key Features
Certified Raw Material
Wire rod is sourced from certified mills with traceable chemistry and heat numbers.
Tight Tolerance Drawing
Multi-pass drawing holds diameter and ovality to strict tolerance for smooth processing.
Coating Options
Electro-galvanized, hot-dipped galvanized, PVC and painted finishes to match the service environment.
Production Coil Formats
Spools, small coils and 500kg+ big coils wound for trouble-free machine pay-off.
Applications
Wire Manufacturing
Construction
Mesh Weaving
Packing & Binding
Frequently Asked Questions
What is the minimum order quantity?
Standard MOQ is 2,000 kg; small trial quantities can be discussed for new customers.
Do you supply mill test certificates?
Yes, every consignment ships with a certificate of chemistry and mechanical properties on request.
Can coils be wound to our specification?
We wind to your required coil weight, inner diameter and traversed or ribbon format to suit your payoff equipment.
What is the lead time?
Stocked gauges ship in 7-15 days; custom drawing and coating runs take 20-30 days.


